In partnership with developer Charter Hall, Taylor has successfully delivered a large parcel distribution and sorting facility to established tenant Australia Post. The works included over 7,200m2 of hardstand pavement for access and operations and a carpark with over 80 carpark spaces.

The facility has an extensive operational floor area of 22,000m2, primarily consisting of an expansive 20,000m2 warehouse that includes 1,580m2 of suspended warehouse slab and an advanced multifaceted automated parcel scanning system that sorts and distributes parcels without the need for site labour.

Division
Industrial

Client
Charter Hall

Location
Chullora, NSW

Value
$24.5 million

Status
Completed November 2018

2 1500m2 main office area at australia post chullora taylor construction industrial 2

The sizable site also houses a generous main office area with various amenities spanning 1,500m2 and a new two-lane B-Double interlinking driveway. This heavy-duty pavement road connects to an existing Australia Post facility adjacent to the development and facilitates convenient and smooth transport between the neighbouring structures.

A prominent and highly unique feature of the building is the super awning which spans 140 metres in length and 30 metres width. The largest of its kind in Australia, this superstructure comprises two 70 metre arched trusses, providing a clear column to column span of 70 metres. The huge shelter enables for loading throughout the year, resulting in greater productivity rates and overall efficiency.

Additional scope of works included several ancillary offices such as a Dock Office Control Room, Tech Office, Warehouse Office and 7,341m2 of external heavy-duty concrete pavements, 2-off inground stormwater onsite detention tanks and a fire pump room, sprinkler tank and rainwater tank. The facility also contains a carpark built over 2,836m2 of light-duty pavement, which accommodates parking for up to 80 vehicles and includes an under-croft carpark.

Taylor prioritised and fast-tracked the design and construction and coordinated a staged handover, ultimately enabling Australia Post to occupy their tenancy in November 2018, before the peak Christmas season.

9 super awning feature at australia post chullora taylor construction industrial
7 two lane b double interlinking driveway at australia post chullora taylor construction industrial
8 automated parcel scanning system at australia post chullora taylor construction industrial